Invest Phuket
Trimite o solicitare
AYANA Heights Seaview Residence

AYANA Heights Seaview Residence

LayanPrevânzareApartament

฿8.36M – ฿26.5M

Tip de proprietate
Apartament
Număr total de locuințe
549
Suprafață
40,9–92,04 m²
Dormitoare
1–3
Preț / m²
฿190K
Localizare
Layan
Stadiu
Prevânzare
Tip de proprietate
Freehold / Leasehold
Finalizare
În fază de proiect

Localizare

Layan

AYANA Heights Seaview Residence

Deschideți în Google Maps
Layan Beach
3-5 min
Zona Laguna și Bang Tao
10-15 min
Porto de Phuket
15 min
Aeroportul Internațional Phuket
25 min

Rezidențe și compartimentări

TipSuprafațăPreț
1 dormitor40.9 m²La cerere →
2 dormitoare64.38 m²La cerere →
3 dormitoare92.04 m²La cerere →

Planuri și plan general

1 / 3

Tur video

Facilități și stil de viață

Zona de piscine în stil resort

Un ansamblu spectaculos de piscine, cu terase amenajate și colțuri de relaxare, care creează de la prima vedere atmosfera unui resort de cinci stele.

Curte de acces și lobby

Curtea de la intrare, elementul de apă și lobby-ul le oferă rezidenților și oaspeților o primire elegantă la fiecare sosire.

Muncă și bunăstare

Spații de coworking, lounge, fitness, saună și wellness pentru viața de zi cu zi și pentru oaspeții cu șederi mai lungi.

Locuire privată cu vedere la mare

Anumite planuri au balcoane orientate spre mare, fie că veți locui aici, fie că veți închiria locuința.

Actualizare verificată la sursă

Stadiul construcției

august 2026
august 2026

AYANA Heights — construction update · August 2026

AYANA Heights Seaview Residences continue to progress nicely this month. Building H leads the way, now well into architectural and MEP installation work, while Buildings E, F, and G have completed their structural frames, with F progressing to roof floor construction. Building C is taking shape with pool construction advancing alongside its 6th floor. Building B has reached its 6th floor with column work underway and Building D has completed its foundation and moved into MEP installation. Across the site, retaining wall works continue to strengthen our community's foundations for the Seaview lifestyle ahead.

iulie 2026

AYANA Heights — construction update · July 2026

AYANA Heights Seaview Residences continue to progress nicely this month. Building H leads the way, now well into architectural and MEP installation work, while Buildings E, F, and G have completed their structural frames, with F progressing to roof floor construction. Building C is taking shape with pool construction advancing alongside its 6th floor. Building B has reached its 6th floor with column work underway and Building D has completed its foundation and moved into MEP installation. Across the site, retaining wall works continue to strengthen our community's foundations for the Seaview lifestyle ahead.

iunie 2026

AYANA Heights — construction update · June 2026

AYANA Heights Seaview Residences is advancing very well this month. Building H leads the way, now moving into architectural and interior installation work, while Buildings E and G have completed their structural frames and progressed to Cera wall and MEP fit-out. Building F continues rising with column work on its 6th floor, and Building C is taking shape with pool construction and column work underway on the 5th floor. Buildings A and D remain in advanced foundation stages. Across the site, road and retaining wall works continue to strengthen our community's foundations for the sea view lifestyle ahead

mai 2026

AYANA Heights — actualizare a lucrărilor de construcție · mai 2026

În clădirile G și H avansează susținut montajul pereților Cera și lucrările la instalațiile mecanice, electrice și sanitare, iar în clădirea F se execută stâlpii nivelului 4. Clădirea C a ajuns la structura nivelului 3, fiind în curs și construcția piscinei. Fundațiile clădirilor A și D continuă să avanseze constant, conform graficului.

aprilie 2026

AYANA Heights — construction update · April 2026

AYANA Heights is making impressive strides, with Buildings G and H now at 99% structural completion and actively advancing into Cera wall cladding and MEP installation. Building E has reached the 6th floor construction phase, marking a significant visual milestone for the development. Building F progresses strongly through its 3rd floor columns. Buildings B and C continue floor and structural work, as foundations for Buildings A and D advance steadily on schedule.

martie 2026

AYANA Heights — construction update · March 2026

AYANA Heights continues to rise impressively, with Buildings G and H leading the way at 98% structural completion, now advancing into Cera wall cladding and MEP installation. Building E has reached the 5th floor construction phase, while Building F progresses steadily through its 2nd floor. Buildings B and C are advancing with column and structural work well underway, as foundations for Buildings A and D continue to progress confidently on schedule.

februarie 2026

AYANA Heights — construction update · February 2026

Buildings G and H are leading progress, both reaching 97% structural completion with teams now focused on stair construction, MEP work, and Cera wall installation. Building E has advanced to the 3rd floor (32% structural), while Building B is progressing with its first-floor slab and water tank construction. Foundation work is nearing total completion across the site, with Building A reaching 89% as it transitions into column and beam construction for the water tank.

ianuarie 2026

AYANA Heights — construction update · January 2026

Development at AYANA Heights remains on schedule with significant milestones achieved this January. Foundation work for Buildings B, C, E, F, G, and H is now 100% complete, while Building A has reached 75%. Vertical progress is most visible at Building H, which has reached 95% structural completion, followed by Building G at 85%, with teams now proceeding to the roof floor. Building E structural work is at 10% and Building F at 2% as we transition into floor and slab construction. Building B is currently focused on basement floor flat slab work and retaining walls, while Buildings A, C, and D proceed with column, beam, and footing construction.

decembrie 2025

AYANA Heights — construction update · December 2025

Development at AYANA Heights remains on schedule, with significant milestones achieved in December. Foundation work for Buildings E, F, G, and H is now 100% complete. Additionally, pile driving for Buildings A, B, and D has been successfully finalized. Vertical progress is most visible at Building H, which has reached 47% structural completion, followed by Building G is at 30%. Current on-site activities focus on pile cutting and the initial construction of columns and walls. We remain committed to maintaining this momentum as we transition fully into the structural phase.

noiembrie 2025

AYANA Heights — construction update · November 2025

Construction at AYANA Heights Seaview Residences shows steady progress across all buildings. Building A has completed pile driving and moved to pile cutting, while Building B advances with pile cutting and footing work. Building C continues with pile cutting, rebar footing, and column preparation. Building D progresses with soil excavation and pile operations, while Buildings E and F advance through raft foundation and wall construction. Building G moves into column and scaffolding work, and Building H advances to second-floor structural progress. Infrastructure also continues, with Road Zone 1 retaining wall completed and Zones 2-4 moving through soil and pile operations.

octombrie 2025

AYANA Heights — construction update · October 2025

Progress continues at AYANA Heights Seaview Residences, with steady development across all buildings. From initial pile driving to first-floor construction, each residence is advancing toward completion. Building H leads at 21% progress, while infrastructure in Road Zones 1–4 moves ahead.

septembrie 2025

AYANA Heights — construction update · September 2025

Building B has commenced pile driving operations at 3% progress with dynamic pile testing underway. Building C has completed pile driving and is proceeding with pile cutting at 10% completion. Building D is advancing with soil excavation and dynamic pile testing. Buildings E and G continue pile cutting work at 10% progress. Building F has reached 10% completion, proceeding with raft foundation construction and rock drilling. Building H demonstrates the highest progress at 12%, advancing with raft foundation construction. Road Zone 1 retaining wall work is completed at 10%, while Road Zones 2-4 progress with pile driving and soil cutting operations.

august 2025

AYANA Heights — construction update · August 2025

Building E has completed 100% of piling work with retaining wall construction at 90% and pile cutting work advancing at 20%. Building F has achieved full completion of piling, excavation footing, and pile cutting work. Building G has finished piling work entirely with pile cutting progressing at 30%. Building H demonstrates outstanding progress with 100% completion of both piling and pile cutting work. Building C has prepared the construction area and commenced piling operations. The retaining wall construction maintains 100% completion for both footing and wall concrete pouring with backfill work ongoing.

iulie 2025

AYANA Heights — construction update · July 2025

Building E has advanced significantly with pile cutting work ongoing and retaining wall construction at 90% completion. Building F shows solid progress with new bored pile work underway and footing excavation in progress. Building G is preparing for new needle drilling work, while Building H has achieved 50% completion on bored pile operations. Building C has completed piling work with dynamic testing on 800mm diameter piles, and the retaining wall construction has reached 100% completion for both footing and wall concrete pouring, with backfill soil work now underway.

iunie 2025

AYANA Heights — construction update · June 2025

The AYANA Heights Seaview Residence continues its upward momentum, with construction across key buildings and infrastructure moving steadily forward as of Week 21 (ending June 27, 2025). Piling is now 100% complete for Buildings E, G, and H. Building F is also well underway with over half of its pile work completed (195 of 386 piles installed). Pile cutting activities are ongoing across several buildings: 222 piles are done for Building E, 94 for Building F, and 79 for Building H. Retaining wall works near the pavilion have reached the concrete pouring and formwork stage, showing visible progress on site. Soil cutting for Building C and the internal road is now complete, which enables the next stages of foundation and structure work to begin. Bore pile work for Building C is awaiting access via the temporary road, and revisions to the pile design are in process. Off-site, the deep well for water supply is complete, and AYANA is now queued for connection to the private waterworks system. A new tower crane is being prepped for installation, providing enhanced lifting capacity to support upcoming vertical works.

mai 2025

AYANA Heights — construction update · May 2025

Building E has now completed 100% of its piling work, with 90% of pile foundation cutting completed. The reinforced concrete tie retaining wall is now also in place, establishing a critical element of the building’s structural integrity. Building F is advancing steadily, with piling work now over halfway complete at 51%. Pile foundation cutting stands at 40%, marking consistent movement toward structural development. Building G has completed all piling work, with pile foundation cutting at 35%, a strong indication of ongoing momentum on-site. Building H mirrors similar progress, with piling work finalized and pile foundation cutting now reaching 64%, bringing this building into the next phase of its structural development. Meanwhile, Building C has completed 100% of its earthwork excavation. This foundational milestone paves the way for subsequent structural activity to commence without delay.

aprilie 2025

AYANA Heights — construction update · April 2025

Building E: Piling completed 100%. Building F: Piling completed 100%. Building G: Piling completed 100%. Building H: Piling completed 100%. Buildings E, F, G, and H: Pile cutting work completed 5%. Building C: Excavation completed 100%, preparing for piling.

martie 2025

AYANA Heights — construction update · March 2025

Building E – Piling work 80% complete. Building F – Piling work 40% complete. Building G – Piling work 100% complete. Building H – Piling work 100% complete.

februarie 2025

AYANA Heights — construction update · February 2025

Ayana Heights Seaview Residences moving forward with the preparation work for construction and have begun the process of cement-reinforced concrete piling, which is a crucial step in ensuring the long-term strength and stability of the foundation This phase is an essential part of preparing the site and laying the groundwork for the premium sea-view residences, and we look forward to providing an unparalleled living experience for future owners and clients.

ianuarie 2025

AYANA Heights — construction update · January 2025

AYANA recently held a groundbreaking ceremony for AYANA Heights, a new luxury ocean-view apartment project in Layan. The event included blessings and prayers for the project's success and featured a ribbon-cutting ceremony to officially launch construction.

Despre proiect

AYANA Heights Seaview Residence este un proiect nou în Layan, Phuket. Invest Phuket este o consultanță independentă — lucrăm cu toate proiectele de pe insulă și negociem pentru dumneavoastră direct cu biroul de vânzări al dezvoltatorului.

Dezvoltator: T.H. Group Phuket Co., Ltd. · Profilul dezvoltatorului →

Site dedicat proiectului: Deschideți site-ul proiectului ↗

Întrebările cumpărătorilor

›Pot afla prețurile de azi pentru Ayana Heights?

Da. Folosiți formularul sau butonul WhatsApp și vă trimitem prețurile actuale, exemple de planuri și disponibilitatea.

›Unde se află Ayana Heights?

Ayana Heights se află în zona Layan din Phuket, aproape de plaja Layan și la mică distanță de Laguna, Bang Tao, Porto de Phuket și aeroport.

›Ce tipuri de unități sunt disponibile?

Există garsoniere, apartamente cu 1 și 2 dormitoare și planuri mai mari pentru familii, cu exemple de planuri pentru mai multe tipuri de unități.

›Este Ayana Heights potrivit pentru cumpărătorii străini?

Da. Proiectul oferă atât proprietate deplină (freehold), cât și leasehold, astfel încât cumpărătorii internaționali pot alege varianta care li se potrivește.

›Ce ar trebui să cer înainte de a lua o decizie?

Cereți prețurile de azi, planurile, graficul de plată, precum și poziția exactă a unității și orientarea vederii spre mare.

Prețurile, disponibilitatea și planurile de plată se schimbă săptămânal și sunt confirmate de dezvoltator la momentul solicitării. Invest Phuket este o consultanță independentă pentru proiecte noi.

Primiți lista de prețuri