Invest Phuket
提交咨询
AYANA Heights Seaview Residence

AYANA Heights Seaview Residence

Layan预售公寓

฿8.36M – ฿26.5M

物业类型
公寓
总户数
549
面积
40.9–92.04 m²
卧室
1–3
每平方米价格
฿190K
位置
Layan
项目状态
预售
产权类型
Freehold / Leasehold
交付
期房

位置

Layan

AYANA Heights Seaview Residence

在 Google 地图中查看
Layan Beach
3-5 min
Laguna 和 Bang Tao 区域
10-15 min
Porto de Phuket
15 min
Phuket 国际机场
25 min

户型与房源

类型面积价格
1卧40.9 m²价格请咨询 →
2卧64.38 m²价格请咨询 →
3卧92.04 m²价格请咨询 →

户型图与总平面图

1 / 3

视频看房

配套设施与生活方式

度假式泳池区

引人注目的多泳池中心装饰,配有景观甲板、休闲口袋,给人第一印象就是五星级度假村的感觉。

入口庭院与大堂

入口庭院、水景和大堂,让住户与访客每次抵达都感受到高端礼遇。

工作与健康

联合办公、休息室、健身房、桑拿与康养空间,满足日常生活所需,也适合长住的客人。

海景私人生活

部分户型连接朝海阳台,无论自住还是出租都很合适。

经核实的来源更新

施工进度

2026年8月
2026年8月

AYANA Heights — construction update · August 2026

AYANA Heights Seaview Residences continue to progress nicely this month. Building H leads the way, now well into architectural and MEP installation work, while Buildings E, F, and G have completed their structural frames, with F progressing to roof floor construction. Building C is taking shape with pool construction advancing alongside its 6th floor. Building B has reached its 6th floor with column work underway and Building D has completed its foundation and moved into MEP installation. Across the site, retaining wall works continue to strengthen our community's foundations for the Seaview lifestyle ahead.

2026年7月

AYANA Heights — construction update · July 2026

AYANA Heights Seaview Residences continue to progress nicely this month. Building H leads the way, now well into architectural and MEP installation work, while Buildings E, F, and G have completed their structural frames, with F progressing to roof floor construction. Building C is taking shape with pool construction advancing alongside its 6th floor. Building B has reached its 6th floor with column work underway and Building D has completed its foundation and moved into MEP installation. Across the site, retaining wall works continue to strengthen our community's foundations for the Seaview lifestyle ahead.

2026年6月

AYANA Heights — construction update · June 2026

AYANA Heights Seaview Residences is advancing very well this month. Building H leads the way, now moving into architectural and interior installation work, while Buildings E and G have completed their structural frames and progressed to Cera wall and MEP fit-out. Building F continues rising with column work on its 6th floor, and Building C is taking shape with pool construction and column work underway on the 5th floor. Buildings A and D remain in advanced foundation stages. Across the site, road and retaining wall works continue to strengthen our community's foundations for the sea view lifestyle ahead

2026年5月

AYANA Heights — 施工进展更新 · 2026年五月

G栋和H栋的Cera墙体安装及机电、给排水工程正在稳步推进,F栋则正在施工第4层立柱。C栋的第3层结构正在建设中,泳池施工也已展开;A栋和D栋的基础工程继续按计划稳步推进。

2026年4月

AYANA Heights — construction update · April 2026

AYANA Heights is making impressive strides, with Buildings G and H now at 99% structural completion and actively advancing into Cera wall cladding and MEP installation. Building E has reached the 6th floor construction phase, marking a significant visual milestone for the development. Building F progresses strongly through its 3rd floor columns. Buildings B and C continue floor and structural work, as foundations for Buildings A and D advance steadily on schedule.

2026年3月

AYANA Heights — construction update · March 2026

AYANA Heights continues to rise impressively, with Buildings G and H leading the way at 98% structural completion, now advancing into Cera wall cladding and MEP installation. Building E has reached the 5th floor construction phase, while Building F progresses steadily through its 2nd floor. Buildings B and C are advancing with column and structural work well underway, as foundations for Buildings A and D continue to progress confidently on schedule.

2026年2月

AYANA Heights — construction update · February 2026

Buildings G and H are leading progress, both reaching 97% structural completion with teams now focused on stair construction, MEP work, and Cera wall installation. Building E has advanced to the 3rd floor (32% structural), while Building B is progressing with its first-floor slab and water tank construction. Foundation work is nearing total completion across the site, with Building A reaching 89% as it transitions into column and beam construction for the water tank.

2026年1月

AYANA Heights — construction update · January 2026

Development at AYANA Heights remains on schedule with significant milestones achieved this January. Foundation work for Buildings B, C, E, F, G, and H is now 100% complete, while Building A has reached 75%. Vertical progress is most visible at Building H, which has reached 95% structural completion, followed by Building G at 85%, with teams now proceeding to the roof floor. Building E structural work is at 10% and Building F at 2% as we transition into floor and slab construction. Building B is currently focused on basement floor flat slab work and retaining walls, while Buildings A, C, and D proceed with column, beam, and footing construction.

2025年12月

AYANA Heights — construction update · December 2025

Development at AYANA Heights remains on schedule, with significant milestones achieved in December. Foundation work for Buildings E, F, G, and H is now 100% complete. Additionally, pile driving for Buildings A, B, and D has been successfully finalized. Vertical progress is most visible at Building H, which has reached 47% structural completion, followed by Building G is at 30%. Current on-site activities focus on pile cutting and the initial construction of columns and walls. We remain committed to maintaining this momentum as we transition fully into the structural phase.

2025年11月

AYANA Heights — construction update · November 2025

Construction at AYANA Heights Seaview Residences shows steady progress across all buildings. Building A has completed pile driving and moved to pile cutting, while Building B advances with pile cutting and footing work. Building C continues with pile cutting, rebar footing, and column preparation. Building D progresses with soil excavation and pile operations, while Buildings E and F advance through raft foundation and wall construction. Building G moves into column and scaffolding work, and Building H advances to second-floor structural progress. Infrastructure also continues, with Road Zone 1 retaining wall completed and Zones 2-4 moving through soil and pile operations.

2025年10月

AYANA Heights — construction update · October 2025

Progress continues at AYANA Heights Seaview Residences, with steady development across all buildings. From initial pile driving to first-floor construction, each residence is advancing toward completion. Building H leads at 21% progress, while infrastructure in Road Zones 1–4 moves ahead.

2025年9月

AYANA Heights — construction update · September 2025

Building B has commenced pile driving operations at 3% progress with dynamic pile testing underway. Building C has completed pile driving and is proceeding with pile cutting at 10% completion. Building D is advancing with soil excavation and dynamic pile testing. Buildings E and G continue pile cutting work at 10% progress. Building F has reached 10% completion, proceeding with raft foundation construction and rock drilling. Building H demonstrates the highest progress at 12%, advancing with raft foundation construction. Road Zone 1 retaining wall work is completed at 10%, while Road Zones 2-4 progress with pile driving and soil cutting operations.

2025年8月

AYANA Heights — construction update · August 2025

Building E has completed 100% of piling work with retaining wall construction at 90% and pile cutting work advancing at 20%. Building F has achieved full completion of piling, excavation footing, and pile cutting work. Building G has finished piling work entirely with pile cutting progressing at 30%. Building H demonstrates outstanding progress with 100% completion of both piling and pile cutting work. Building C has prepared the construction area and commenced piling operations. The retaining wall construction maintains 100% completion for both footing and wall concrete pouring with backfill work ongoing.

2025年7月

AYANA Heights — construction update · July 2025

Building E has advanced significantly with pile cutting work ongoing and retaining wall construction at 90% completion. Building F shows solid progress with new bored pile work underway and footing excavation in progress. Building G is preparing for new needle drilling work, while Building H has achieved 50% completion on bored pile operations. Building C has completed piling work with dynamic testing on 800mm diameter piles, and the retaining wall construction has reached 100% completion for both footing and wall concrete pouring, with backfill soil work now underway.

2025年6月

AYANA Heights — construction update · June 2025

The AYANA Heights Seaview Residence continues its upward momentum, with construction across key buildings and infrastructure moving steadily forward as of Week 21 (ending June 27, 2025). Piling is now 100% complete for Buildings E, G, and H. Building F is also well underway with over half of its pile work completed (195 of 386 piles installed). Pile cutting activities are ongoing across several buildings: 222 piles are done for Building E, 94 for Building F, and 79 for Building H. Retaining wall works near the pavilion have reached the concrete pouring and formwork stage, showing visible progress on site. Soil cutting for Building C and the internal road is now complete, which enables the next stages of foundation and structure work to begin. Bore pile work for Building C is awaiting access via the temporary road, and revisions to the pile design are in process. Off-site, the deep well for water supply is complete, and AYANA is now queued for connection to the private waterworks system. A new tower crane is being prepped for installation, providing enhanced lifting capacity to support upcoming vertical works.

2025年5月

AYANA Heights — construction update · May 2025

Building E has now completed 100% of its piling work, with 90% of pile foundation cutting completed. The reinforced concrete tie retaining wall is now also in place, establishing a critical element of the building’s structural integrity. Building F is advancing steadily, with piling work now over halfway complete at 51%. Pile foundation cutting stands at 40%, marking consistent movement toward structural development. Building G has completed all piling work, with pile foundation cutting at 35%, a strong indication of ongoing momentum on-site. Building H mirrors similar progress, with piling work finalized and pile foundation cutting now reaching 64%, bringing this building into the next phase of its structural development. Meanwhile, Building C has completed 100% of its earthwork excavation. This foundational milestone paves the way for subsequent structural activity to commence without delay.

2025年4月

AYANA Heights — construction update · April 2025

Building E: Piling completed 100%. Building F: Piling completed 100%. Building G: Piling completed 100%. Building H: Piling completed 100%. Buildings E, F, G, and H: Pile cutting work completed 5%. Building C: Excavation completed 100%, preparing for piling.

2025年3月

AYANA Heights — construction update · March 2025

Building E – Piling work 80% complete. Building F – Piling work 40% complete. Building G – Piling work 100% complete. Building H – Piling work 100% complete.

2025年2月

AYANA Heights — construction update · February 2025

Ayana Heights Seaview Residences moving forward with the preparation work for construction and have begun the process of cement-reinforced concrete piling, which is a crucial step in ensuring the long-term strength and stability of the foundation This phase is an essential part of preparing the site and laying the groundwork for the premium sea-view residences, and we look forward to providing an unparalleled living experience for future owners and clients.

2025年1月

AYANA Heights — construction update · January 2025

AYANA recently held a groundbreaking ceremony for AYANA Heights, a new luxury ocean-view apartment project in Layan. The event included blessings and prayers for the project's success and featured a ribbon-cutting ceremony to officially launch construction.

项目简介

AYANA Heights Seaview Residence 是位于普吉岛Layan的新建项目。Invest Phuket 是独立顾问机构——我们覆盖全岛所有项目,并代表您直接与开发商销售处洽谈。

开发商: T.H. Group Phuket Co., Ltd. · 开发商简介 →

项目专属网站: 打开项目网站 ↗

买家常见问题

›可以获取 Ayana Heights 的今日价格吗?

可以。通过表单或 WhatsApp 按钮联系我们,我们会发送最新价格、户型样例和可售房源。

›Ayana Heights 位于哪里?

Ayana Heights 位于普吉岛 Layan 区域,靠近 Layan 海滩,前往 Laguna、邦涛、Porto de Phuket 和机场都很方便。

›有哪些户型可选?

提供开间、1 卧、2 卧以及更大的家庭户型,多种户型均有样板平面图。

›Ayana Heights 适合国外买家吗?

是的。项目同时提供永久产权和租赁产权,国际买家可以选择适合自己的方式。

›在做出决定之前我应该​​问什么?

请咨询当日价格、户型图、付款计划,以及房源的具体位置和海景朝向。

价格、可售房源及付款计划每周变动,以咨询时开发商确认为准。Invest Phuket 是独立的新盘顾问机构。

获取价格表